Edmonton Rough Grade
This stage includes backfilling the foundation walls and shaping the lot to conform to the design of the approved Surface Drainage Plan. The Rough Grade Approval procedure should occur within 60 days of the initial site grading. It is the builder's responsibility to ensure that roof leaders (downspouts) and foundation drainage systems are installed according to the approved engineering drawings.